Bridge the wait for a grid connection

Keep investing while the electricity grid catches up

Waiting for the required grid capacity is not a strategy

A grid connection can determine the pace of your entire project. In many locations, businesses cannot obtain the required grid capacity within the desired timeframe.

This may affect:

  • New commercial developments

  • Logistics facilities

  • Industrial projects

  • EV charging locations

  • Construction sites

  • Business expansions

  • New production facilities

A lack of available grid capacity can delay commissioning, prevent the installation of electrical equipment or restrict operations after a project has been completed. Temporary and flexible energy solutions can help reduce dependence on the timeline of the electricity grid.

Our solutions

A delayed or limited grid connection does not have to bring your project to a standstill. With flexible energy storage, local generation and intelligent energy management, you can create the capacity needed to keep moving.

Power Storage Solutions can combine different technologies to create an energy system around the requirements of your site. Depending on the situation, this may include:

Popular Combinations

Transformer + Lithium battery

Rapid expansion of available capacity.

Transformer + Redox flow battery

For energy-intensive applications with high continuity requirements.

Transformer + Battery storage + Smart charging solutions

A complete solution for logistics hubs, industrial sites and large-scale charging infrastructure.

Result

  • No need to wait for the grid operator

  • Business development can continue

  • Faster return on investment

GridOne 3.jpg

Ready to skip the queue?

For questions, quotes or advice, contact us.