Fast Charging Without Grid Reinforcement
More charging capacity from your existing grid connection
Electric trucks, commercial vehicles and passenger cars require increasing charging capacity.
The demand for electric vehicle charging is growing rapidly. Fleets are electrifying, logistics operators are investing in electric transport and customers increasingly expect fast and reliable charging. In many cases, the available grid capacity is not sufficient. Typical callenges:
Insufficient grid capacity
High connection costs
Long waiting times
Limited number of charging points
Imagine that your location has a grid connection of 250 kW. A 400 kW fast charger would normally require more power than the grid can provide. The conventional solution is to upgrade the grid connection. But this can involve high costs, complex civil and electrical work and long waiting times. A battery-buffered charging system provides an alternative. Instead of drawing the full charging power directly from the grid, the system combines available grid power with energy stored in an integrated or external battery.
The grid connection should not determine your charging ambitions
By combining battery storage with smart charging technology, companies can create a flexible charging system that buffers energy locally and uses it only when vehicles are charging.
Our solutions
intelligent energy management
Popular Combinations
Smart charging + Lithium battery
For companies that want to expand their charging capacity quickly.
Smart charging + Transformer
When additional connection capacity is required.
Smart charging + Lithium battery + Transformer
For truck depots, logistics hubs and large-scale charging plazas.
Result
Charge more vehicles at the same time
Avoid major grid investments
Maximize the use of available capacity