Fast Charging Without Grid Reinforcement

More charging capacity from your existing grid connection

Electric trucks, commercial vehicles and passenger cars require increasing charging capacity.

The demand for electric vehicle charging is growing rapidly. Fleets are electrifying, logistics operators are investing in electric transport and customers increasingly expect fast and reliable charging. In many cases, the available grid capacity is not sufficient. Typical callenges:

  • Insufficient grid capacity

  • High connection costs

  • Long waiting times

  • Limited number of charging points

Imagine that your location has a grid connection of 250 kW. A 400 kW fast charger would normally require more power than the grid can provide. The conventional solution is to upgrade the grid connection. But this can involve high costs, complex civil and electrical work and long waiting times. A battery-buffered charging system provides an alternative. Instead of drawing the full charging power directly from the grid, the system combines available grid power with energy stored in an integrated or external battery.

The grid connection should not determine your charging ambitions

By combining battery storage with smart charging technology, companies can create a flexible charging system that buffers energy locally and uses it only when vehicles are charging.

Our solutions

Popular Combinations

Smart charging + Lithium battery

For companies that want to expand their charging capacity quickly.

Smart charging + Transformer

When additional connection capacity is required.

Smart charging + Lithium battery + Transformer

For truck depots, logistics hubs and large-scale charging plazas.

Result

  • Charge more vehicles at the same time

  • Avoid major grid investments

  • Maximize the use of available capacity